API-936 EXAM OUTLINE | RELIABLE API-936 TEST GUIDE

API-936 Exam Outline | Reliable API-936 Test Guide

API-936 Exam Outline | Reliable API-936 Test Guide

Blog Article

Tags: API-936 Exam Outline, Reliable API-936 Test Guide, API-936 Exam Blueprint, Latest API-936 Exam Cram, Exam API-936 Cost

A lot of applicants have studied from API API-936 practice material. They have rated it positively because they have cracked API API-936 Certification on their first try. Pass4training guarantees its customers that they can pass the API-936 test on the first attempt.

API-936: Refractory Personnel Exam is a valuable certification for individuals working with refractory materials in the petrochemical industry. It demonstrates an individual's knowledge and skills in the field and is highly valued by employers in the industry. Passing the exam requires a thorough understanding of refractory materials and their applications, as well as a commitment to safety and adherence to regulations.

Obtaining the API-936 (Refractory Personnel) certification is an important credential for individuals working in the refractory installation industry. It demonstrates a high level of expertise and knowledge in the field, and can lead to career advancement opportunities and higher salaries. Additionally, companies that employ API-certified refractory personnel can benefit from improved safety, increased productivity, and reduced downtime.

>> API-936 Exam Outline <<

Valid API API-936 Exam Outline Are Leading Materials & Free Download Reliable API-936 Test Guide

Propulsion occurs when using our API-936 practice materials. They can even broaden amplitude of your horizon in this line. Of course, knowledge will accrue to you from our API-936 practice materials. There is no inextricably problem within our API-936 practice materials. Motivated by them downloaded from our website, more than 98 percent of clients conquered the difficulties. So can you.

API Refractory Personnel Sample Questions (Q10-Q15):

NEW QUESTION # 10
If application of hydraulic bonded or chemical setting refractory is interrupted, the refractory lining shall be:

  • A. immediately cut back to the shell between anchors.
  • B. cut back to the shell in a straight line.
  • C. cut back within 1 hour.
  • D. cut back within 30 minutes.

Answer: A

Explanation:
When installation is interrupted, the partially installed refractory must becut back to the shell between anchorswhile it is still workable. This ensures a clean, rough bonding surface free from weak or partially set material. API 936 requires this method for bothhydraulic bondedandchemically bondedsystems to preserve lining integrity and avoid delamination between old and new material.
Reference:
API Std 936, Section 6.2.3 - "When work is interrupted, material shall be cut back to the shell between anchors while still plastic."


NEW QUESTION # 11
As-installed gunned test specimens are prepared by cutting specimens with a:

  • A. trowel
  • B. portable rescue saw
  • C. diamond saw
  • D. band saw

Answer: C

Explanation:
In API 936, it is specified that as-installed specimens of gunned refractory linings are to be cut from the installation using adiamond saw. This ensures precision and avoids thermal or mechanical damage to the specimen, which could otherwise alter the properties being tested such as density or strength.
This practice is consistent with ASTM standards (e.g., ASTM C133, ASTM C704) referenced in API 936 for the preparation of physical specimens.
Reference:API Std 936, Section 6.4.4 - "Cutting of test specimens shall be performed using a water-cooled diamond saw to avoid thermal damage."


NEW QUESTION # 12
The standard size of a fabricated test panel for pneumatic gunning qualification is

  • A. (600 mm x 600 mm) 24 " x 24"
  • B. None of the above
  • C. (500 mm x 500 mm)
  • D. (700 mm x 700 mm)

Answer: A


NEW QUESTION # 13
All newly installed air-setting, hydraulic, and chemically bonded linings should be allowed to cure at the proper temperature before initial heating for a minimum of:

  • A. 48 hours
  • B. 24 hours
  • C. 12 hours
  • D. 18 hours

Answer: B

Explanation:
The cure period before initiating the dryout process is a critical phase of installation:
"Newly installed air-setting, hydraulic, and chemically bonded materials shall be allowed to cure for a minimum of 24 hours at 60 °F (16 °C) or above prior to initial heating."
- API TR 980, Section 6.2.1
This condition ensures chemical bonding processes are complete before exposure to thermal stress.


NEW QUESTION # 14
Gunning test panels are constructed with removable backs as required for

  • A. visual inspection of the castable
  • B. laboratory test
  • C. None of the above
  • D. physical property test

Answer: A


NEW QUESTION # 15
......

With the intense competition in labor market, it has become a trend that a lot of people, including many students, workers and so on, are trying their best to get a API-936 certification in a short time. They all long to own the useful certification that they can have an opportunity to change their present state, including get a better job, have a higher salary, and get a higher station in life and so on, but they also understand that it is not easy for them to get a API-936 Certification in a short time. If you are the one of the people who wants to get a certificate, we are willing to help you solve your problem.

Reliable API-936 Test Guide: https://www.pass4training.com/API-936-pass-exam-training.html

Report this page